Plumbing contractor software · Commercial projects
Commercial plumbing software, tested on one field change
Residential plumbing software books a visit and takes payment on the day. A commercial plumbing contractor needs something else: a change found on site, priced, approved by the builder and paid, without anyone retyping it. Here is one, start to finish.
Field change FC-031
- Found by
- Dan Okafor · Tue 10:40
- Labour
- 7.5 h, 2 plumbers · 1 h re-test
- Materials
- 4 bends, 1 IO, 3 m pipe
- Variation
- V-12 · $1,462.00
- Approval
- SI-044 · builder, 13:05
Ordin design preview · Proposed workflow · Fictional job, people and figures · Australian dollars, excluding GST
What commercial plumbing software has to do
On a commercial job, the plumbing contractor works to the builder’s contract and the hydraulic drawings. The drawings change, other trades clash with your pipes, and every change is money you only get back if it was approved and priced before the claim. Good software for this work does four things on every change:
- Captures it on siteA photo and a sketch from the plumber, against the right stack, riser or plantroom
- Prices it from real ratesLabour and materials, using the same rates as the original quote
- Holds the work until it’s approvedSo the plumber knows whether to go ahead, and on whose instruction
- Lands it on the job and the claimActual hours and fittings against the variation, then billed once
One field change, from the sketch to the claim
Northline Plumbing is roughing in drainage on a seven-level apartment building. On level 3, a new transfer beam sits where soil stack S3 should pass through.
Tue 10:40
Dan Okafor · plumber
Find the clash and record it
The level 3 soil stack runs straight into a new transfer beam. Dan photographs it, sketches the offset on his phone and stops work on that stack. Nothing is cut yet.
FC-031 · photo, sketch, stack S3 on hold
Tue 11:20
Rhea Lindqvist · project manager
Price the labour and materials
Rhea prices the change from Dan’s sketch: two plumbers for 3.75 hours, four 45° bends, an inspection opening, pipe and brackets, plus the re-test.
V-12 · $1,462.00 · sent to the builder
Tue 13:05
Builder’s site manager
Get approval before the work
The builder approves V-12 under site instruction SI-044. Dan sees the stack change from on hold to approved, with the price and the instruction number.
SI-044 · approved · work released
Wed 15:30
Dan, then accounts
Close it out on the job record
Dan logs the hours and fittings against V-12, re-tests the offset section and marks up the as-built. Accounts adds V-12 to the next progress claim.
V-12 · tested · as-built updated · on claim 6
The variation the builder approved
| Item | Amount |
|---|---|
| Labour · 2 plumbers × 3.75 h at $118 | $885.00 |
| DN100 45° bends × 4 | $109.60 |
| DN100 inspection opening × 1 | $64.20 |
| DN100 pipe, 3 m, and brackets | $94.50 |
| Re-test and as-built markup · 1 h | $118.00 |
| Cost | $1,271.30 |
| Margin · 15% | $190.70 |
| Variation V-12, approved under SI-044 | $1,462.00 |
Questions to ask in a demo
- Can a plumber record a field change with a photo and sketch, against a stack, riser or plantroom, without signal?
- Is the variation priced from the same labour and material rates as the original quote?
- Can work be held until the builder approves, and does the plumber see that on the phone?
- Do actual hours and fittings go to the variation rather than the base contract?
- Do approved variations flow into the progress claim, and unapproved ones stay out?
- Where does the re-test result and the as-built markup live after handover?
These are proposed Ordin workflows with fictional records. Ordin isn’t on sale; early access is planned for Australia. For cost to complete across a whole job, see the job costing guide.
Bring a live variation to early access
Ordin is pre-launch. We’re planning early access for 20 businesses in Australia. Bring a commercial job with a field change in progress, and we’ll use it to set up your first variation.