← Guides for choosing job software

Plumbing contractor software · Commercial projects

Commercial plumbing software, tested on one field change

Residential plumbing software books a visit and takes payment on the day. A commercial plumbing contractor needs something else: a change found on site, priced, approved by the builder and paid, without anyone retyping it. Here is one, start to finish.

Field change FC-031

Kelvin Grove Apartments · stack S3 · level 3

Sketch: the DN100 soil stack hits a new transfer beam below level 3, so it offsets sideways around the beam with four 45 degree bends and an inspection opening, then returns to its line.L3 slabNew transfer beamIODN100 stackoffset clear4 × 45° bendsdrawn route
Found by
Dan Okafor · Tue 10:40
Labour
7.5 h, 2 plumbers · 1 h re-test
Materials
4 bends, 1 IO, 3 m pipe
Variation
V-12 · $1,462.00
Approval
SI-044 · builder, 13:05

Ordin design preview · Proposed workflow · Fictional job, people and figures · Australian dollars, excluding GST

What commercial plumbing software has to do

On a commercial job, the plumbing contractor works to the builder’s contract and the hydraulic drawings. The drawings change, other trades clash with your pipes, and every change is money you only get back if it was approved and priced before the claim. Good software for this work does four things on every change:

  1. Captures it on siteA photo and a sketch from the plumber, against the right stack, riser or plantroom
  2. Prices it from real ratesLabour and materials, using the same rates as the original quote
  3. Holds the work until it’s approvedSo the plumber knows whether to go ahead, and on whose instruction
  4. Lands it on the job and the claimActual hours and fittings against the variation, then billed once

One field change, from the sketch to the claim

Northline Plumbing is roughing in drainage on a seven-level apartment building. On level 3, a new transfer beam sits where soil stack S3 should pass through.

  1. Tue 10:40

    Dan Okafor · plumber

    Find the clash and record it

    The level 3 soil stack runs straight into a new transfer beam. Dan photographs it, sketches the offset on his phone and stops work on that stack. Nothing is cut yet.

    FC-031 · photo, sketch, stack S3 on hold

  2. Tue 11:20

    Rhea Lindqvist · project manager

    Price the labour and materials

    Rhea prices the change from Dan’s sketch: two plumbers for 3.75 hours, four 45° bends, an inspection opening, pipe and brackets, plus the re-test.

    V-12 · $1,462.00 · sent to the builder

  3. Tue 13:05

    Builder’s site manager

    Get approval before the work

    The builder approves V-12 under site instruction SI-044. Dan sees the stack change from on hold to approved, with the price and the instruction number.

    SI-044 · approved · work released

  4. Wed 15:30

    Dan, then accounts

    Close it out on the job record

    Dan logs the hours and fittings against V-12, re-tests the offset section and marks up the as-built. Accounts adds V-12 to the next progress claim.

    V-12 · tested · as-built updated · on claim 6

The variation the builder approved

V-12 · offset stack S3 around transfer beam · level 3
ItemAmount
Labour · 2 plumbers × 3.75 h at $118$885.00
DN100 45° bends × 4$109.60
DN100 inspection opening × 1$64.20
DN100 pipe, 3 m, and brackets$94.50
Re-test and as-built markup · 1 h$118.00
Cost$1,271.30
Margin · 15%$190.70
Variation V-12, approved under SI-044$1,462.00
Where the money is lostNot in the pricing. It’s lost when the plumber does the offset on Tuesday afternoon before anyone has approved it, or when the hours land on the base contract instead of V-12. Ask any vendor to show you the hold and the cost split.

Questions to ask in a demo

  • Can a plumber record a field change with a photo and sketch, against a stack, riser or plantroom, without signal?
  • Is the variation priced from the same labour and material rates as the original quote?
  • Can work be held until the builder approves, and does the plumber see that on the phone?
  • Do actual hours and fittings go to the variation rather than the base contract?
  • Do approved variations flow into the progress claim, and unapproved ones stay out?
  • Where does the re-test result and the as-built markup live after handover?

These are proposed Ordin workflows with fictional records. Ordin isn’t on sale; early access is planned for Australia. For cost to complete across a whole job, see the job costing guide.