Electrical contractor software
Electrical contractor software for a fitout and a fault call in the same week
A commercial electrical contractor buys switchboards against a builder’s program and sends electricians to faults at sites it maintains. Here are both jobs, the decisions in each, and a job card to test any system you shortlist.
Join the early-access waitlist
Ordin design preview · Proposed workflow · Fictional jobs, people and figures · Australian dollars, excluding GST
What a commercial electrical contractor is really buying
Most electrical software is sold on quoting and scheduling. A commercial contractor running projects and maintenance has a harder test: the project manager must order long-lead equipment against the allowance in the accepted quote, while dispatch sends licensed electricians to faults without wrecking the fitout program. Both happen to the same people in the same week.
Words differ by region. Australia and the UK say switchboard, variation and progress claim. In the US the same items are often called switchgear or a panelboard, a change order and a pay application. The checks below are the same.
The switchboard order: over allowance and behind the program
Fenwick Electrical won the power and lighting package for a three-level medical fitout. The builder needs the main switchboard on site in week 12.
Estimate to job · Ana Petrovic, project manager
Order against the allowance in the accepted quote
Ana opens the cost centre and sees what the estimate allowed, from which drawing revision. She doesn’t have to find the estimating spreadsheet to know what she can spend.
- Allowance · accepted quote line 2.04
- $86,400
- Drawing revision quoted
- E-201 Rev B
- Builder’s required on-site date
- Week 12
Purchasing · Ana Petrovic
The manufacturer’s price comes back higher
The consultant’s Rev D added tenant sub-metering and a larger fault rating. The manufacturer’s price follows Rev D, and the lead time only starts when shop drawings are approved. Ana records why the order is over and sends it for approval. The order can’t be issued until someone else approves it.
- Manufacturer’s price · E-201 Rev D
- $93,900
- Over allowance
- $7,500
- Quoted lead time
- 10 weeks from approved shop drawings
Waiting for approval · reason recorded
Approval · Raj Fenwick, owner
Approve the order and claim the change
Raj approves the $93,900 order so the shop drawings can start this week. The Rev D change wasn’t in the price the builder accepted, so Ana raises a variation (change order) for it. Until the builder approves it, the forecast shows the $7,500 overrun against the job, not an assumed recovery.
- Added sub-metering and fault rating · cost
- $7,500
- Variation price to the builder
- $9,200
- Status
- Submitted · not yet in contract value
Order approved · variation pending
The fault call: the electrician who knows the site is on the fitout
Service desk · Leah Moore
A fault at a site Fenwick maintains
Leah opens the call against DB-G2 and sees the board’s last test date and circuit schedule. Only two electricians are inducted at Northgate. Tomas is one, and he’s booked on the medical fitout.
- Reported
- RCD tripping · consult rooms 3 to 6 without power
- Board
- DB-G2 · ground floor
- Site requirement
- Inducted electrician only
Dispatch · Leah Moore
Move two hours, not the whole day
Leah sees the fitout booking before she promises a time. She checks with Ana, moves Tomas for two hours and leaves the leading hand running the cable pull. The clinic gets an 11:30 arrival instead of “sometime tomorrow”.
- 7 am – 11 am
- P-5120 · Level 2 cable pull
- 11:30 am – 1:30 pm
- S-8831 · Northgate fault
- 2 pm – 3:30 pm
- P-5120 · back on the fitout
Leading hand keeps the pull going
Field visit · Tomas Silva
Make safe, record the tests, quote the repair
Tomas restores the consult rooms and leaves circuit 14 isolated. His test results and photos stay with DB-G2, so the next electrician sees them. The office reviews the entry, invoices the call-out and sends the repair quote.
- Cause
- Water in an external outlet on circuit 14
- Action
- Circuit isolated and tagged · other circuits restored
- Recorded
- Test results, two photos, 1.75 h
- Follow-up
- Quote to replace outlet with a weatherproof unit
A job card to bring to every demo
Give each vendor these two jobs and ask them to show the record that answers each line. A system that suits a commercial electrical contractor should keep all of it on the job, not in an email thread.
Switchboard order · purchasing check
- Which drawing revision was quoted, and which revision is the manufacturer pricing?E-201 Rev B quoted, Rev D priced
- What is the allowance on the accepted quote line?Shown on the order, not looked up elsewhere
- Is the order over allowance, and who must approve it?The approval and its reason stay with the order
- Does the lead time meet the builder’s program date?Required on site vs. shop drawing approval plus lead time
- Is the scope change raised as a variation (change order)?Pending until the builder approves it
- What does the overrun do to forecast margin today?Before any variation is approved
Fault call · dispatch and closeout check
- Which electricians are inducted for this site?Before anyone is promised
- Who is free, and what project booking would move?Visible on the same board as the fitout
- Which board and circuits does the call relate to?Last test date and circuit schedule
- Can test results and photos be recorded without signal?Held on the board for the next visit
- Is the make-safe recorded separately from the repair quote?Call-out invoiced, repair quoted
These are proposed Ordin workflows, shown with fictional records. Early access is planned for Australia, and the planned pilot hands sent invoices to Xero. Follow a similar service visit end to end in the service dispatch walkthrough, or see how an order over allowance moves margin in construction job costing.
Bring your switchboard order to early access
Ordin is pre-launch. We’re planning early access for 20 businesses in Australia. Bring a live fitout or a maintenance site and we’ll use it to set up your first workflow.