HVAC service and contractor software
Commercial HVAC software from commissioning to the first service invoice
A commercial HVAC contractor installs plant on a project, then services it under a maintenance contract for years. Here is what should carry over at handover so the first service visit isn’t a wasted trip, and how that visit closes out to an invoice.
Join the early-access waitlist
Ordin design preview · Proposed workflow · Fictional jobs, people and figures · Australian dollars, excluding GST
Why commercial HVAC is a different purchase from residential dispatch
Much HVAC service software is built for residential work: a homeowner books a visit, a technician arrives with a price book and the job is paid on the day. Commercial mechanical work runs differently, and the gaps show up after the installation.
- The customer is a builder during the project and a facility manager or owner afterwards.
- One site has many assets, each with its own commissioning record, warranty and service schedule.
- Service is billed under a maintenance contract, with extra work approved before it’s done.
- Site access needs inductions, keys, roof permits and height safety, not just an address.
- The same technicians are often needed on a project commissioning and a service call in one week.
If you’re comparing HVAC service software or HVAC contractor software for this kind of business, test the handover from project to service, not only the dispatch board.
Handover: commissioning into the asset and the contract
Harlow Mechanical has installed two rooftop packaged units on an office building at Albion. The builder has accepted practical completion, and the owner has signed a quarterly maintenance agreement.
Commissioning · Arlo Reyes
Record what the next technician will need
Arlo completes the commissioning sheet on his phone. The readings are kept on the unit records, not in a PDF emailed to the builder and lost.
- Make, model and serial
- Recorded for each unit
- Refrigerant
- R-32 · factory charge plus 1.2 kg added
- Filters
- 4 × 595 × 595 × 47 mm per unit
- Belts
- None · direct-drive fans
- Set points handed over
- Cooling 23 °C · heating 20 °C
Handover · Mei Tanaka, service manager
Turn the units into assets on a contract
Mei creates the contract from the project handover. The asset details, access notes and approval limit come with it. The first visit is scheduled without anyone retyping the commissioning sheet.
- Assets
- RTU-1, RTU-2 · warranty from practical completion
- Visits
- Quarterly · first due in March
- Contract fee
- $1,280 a visit · scheduled maintenance only
- Access
- Roof hatch key at reception · harness anchor on plan
- Approval for extra work
- Facility manager, above $500
The return visit this avoids
In March, the technician on the first quarterly visit is Kofi, who has never been to Albion. Without the handover record, the usual story is that he arrives, finds the filters are a size the van doesn’t carry, can’t find the roof hatch key and books a second visit. That second trip is unbilled time under a fixed-fee contract.
With the carried information, Kofi picks up eight 595 × 595 × 47 mm filters before he leaves, collects the key from reception and finds the harness anchor on the roof plan. He knows there are no belts to check, and he can compare today’s readings with commissioning.
Closing out the recurring visit to an invoice
Field visit · Kofi Mensah
Do the scheduled work, flag the extra
Kofi finishes the scheduled checklist and records the readings against each unit. He finds a failing capacitor on RTU-2. It isn’t covered by the contract fee, so he records it as extra work, gets approval and replaces it.
- Scheduled maintenance
- Filters replaced, coils checked, readings recorded
- Found
- RTU-2 condenser fan capacitor out of tolerance
- Extra work quoted
- $385 · within the approval limit
- Approval
- Facility manager approved on site
Office review and accounts
One invoice, two kinds of work
Mei checks the visit against the contract: scheduled work at the agreed fee, the extra with its approval attached. Accounts sends the invoice. In the planned Australian pilot, the sent invoice goes to Xero, which keeps the ledger and payments. The June visit is already on the schedule with the same asset records.
- Quarterly maintenance · contract fee
- $1,280
- Approved extra · RTU-2 capacitor replacement
- $385
- Invoice before GST
- $1,665
Planned pilot accounting handoff · Xero
Questions to ask when you evaluate HVAC software
- Can a commissioning sheet completed on a phone create or update the asset record?
- Does a maintenance contract carry its assets, access notes, approval limit and visit schedule from the project handover?
- Before a visit, can the technician see filter sizes, refrigerant type and last readings for each unit?
- How does extra work show against a fixed-fee contract, and where is the customer’s approval kept?
- Can the same board show a commissioning booking and a service call for the same technician?
- Which system holds the ledger, and how does the invoice get there?
These are proposed Ordin workflows with fictional records, not a released product. Early access is planned for Australia. See how the same team handles a breakdown call in the service dispatch walkthrough.