A commercial HVAC contractor installs plant on a project, then services it under a maintenance contract for years. Here is what should carry over at handover so the first service visit isn’t a wasted trip, and how that visit closes out to an invoice.

Join the early-access waitlist

Ordin design preview · Proposed workflow · Fictional jobs, people and figures · Australian dollars, excluding GST

Why commercial HVAC is a different purchase from residential dispatch

Much HVAC service software is built for residential work: a homeowner books a visit, a technician arrives with a price book and the job is paid on the day. Commercial mechanical work runs differently, and the gaps show up after the installation.

  • The customer is a builder during the project and a facility manager or owner afterwards.
  • One site has many assets, each with its own commissioning record, warranty and service schedule.
  • Service is billed under a maintenance contract, with extra work approved before it’s done.
  • Site access needs inductions, keys, roof permits and height safety, not just an address.
  • The same technicians are often needed on a project commissioning and a service call in one week.

If you’re comparing HVAC service software or HVAC contractor software for this kind of business, test the handover from project to service, not only the dispatch board.

Handover: commissioning into the asset and the contract

Harlow Mechanical has installed two rooftop packaged units on an office building at Albion. The builder has accepted practical completion, and the owner has signed a quarterly maintenance agreement.

Commissioning · Arlo Reyes

Record what the next technician will need

Arlo completes the commissioning sheet on his phone. The readings are kept on the unit records, not in a PDF emailed to the builder and lost.

P-2455 · RTU-1 and RTU-2 · Commissioning sheet
Make, model and serial
Recorded for each unit
Refrigerant
R-32 · factory charge plus 1.2 kg added
Filters
4 × 595 × 595 × 47 mm per unit
Belts
None · direct-drive fans
Set points handed over
Cooling 23 °C · heating 20 °C

Handover · Mei Tanaka, service manager

Turn the units into assets on a contract

Mei creates the contract from the project handover. The asset details, access notes and approval limit come with it. The first visit is scheduled without anyone retyping the commissioning sheet.

M-0310 · Albion Offices · Quarterly maintenance
Assets
RTU-1, RTU-2 · warranty from practical completion
Visits
Quarterly · first due in March
Contract fee
$1,280 a visit · scheduled maintenance only
Access
Roof hatch key at reception · harness anchor on plan
Approval for extra work
Facility manager, above $500

The return visit this avoids

In March, the technician on the first quarterly visit is Kofi, who has never been to Albion. Without the handover record, the usual story is that he arrives, finds the filters are a size the van doesn’t carry, can’t find the roof hatch key and books a second visit. That second trip is unbilled time under a fixed-fee contract.

With the carried information, Kofi picks up eight 595 × 595 × 47 mm filters before he leaves, collects the key from reception and finds the harness anchor on the roof plan. He knows there are no belts to check, and he can compare today’s readings with commissioning.

What carried overFilter sizes and counts, refrigerant type and charge, access and permit notes, warranty start date, and the commissioning readings to compare with. Each one is a reason a technician might otherwise come back.

Closing out the recurring visit to an invoice

Field visit · Kofi Mensah

Do the scheduled work, flag the extra

Kofi finishes the scheduled checklist and records the readings against each unit. He finds a failing capacitor on RTU-2. It isn’t covered by the contract fee, so he records it as extra work, gets approval and replaces it.

M-0310 · March visit · Field entry
Scheduled maintenance
Filters replaced, coils checked, readings recorded
Found
RTU-2 condenser fan capacitor out of tolerance
Extra work quoted
$385 · within the approval limit
Approval
Facility manager approved on site

Office review and accounts

One invoice, two kinds of work

Mei checks the visit against the contract: scheduled work at the agreed fee, the extra with its approval attached. Accounts sends the invoice. In the planned Australian pilot, the sent invoice goes to Xero, which keeps the ledger and payments. The June visit is already on the schedule with the same asset records.

M-0310 · March service invoice
Quarterly maintenance · contract fee
$1,280
Approved extra · RTU-2 capacitor replacement
$385
Invoice before GST
$1,665

Planned pilot accounting handoff · Xero

Questions to ask when you evaluate HVAC software

  • Can a commissioning sheet completed on a phone create or update the asset record?
  • Does a maintenance contract carry its assets, access notes, approval limit and visit schedule from the project handover?
  • Before a visit, can the technician see filter sizes, refrigerant type and last readings for each unit?
  • How does extra work show against a fixed-fee contract, and where is the customer’s approval kept?
  • Can the same board show a commissioning booking and a service call for the same technician?
  • Which system holds the ledger, and how does the invoice get there?

These are proposed Ordin workflows with fictional records, not a released product. Early access is planned for Australia. See how the same team handles a breakdown call in the service dispatch walkthrough.